VMS's little sister NAN.V has announced the commencement of drilling on the Earth's Oldest Nickeferous Impact Crater, The Maniitsoq Project.

 

Commences Drilling of Nickel-Copper Targets at its Maniitsoq Ni-Cu-PGE Project, Southwest Greenland

 

Vancouver, B.C. – August 29, 2012. North American Nickel Inc. (TSX VENTURE: NAN) (OTCBB: WSCRF) (CUSIP: 65704T 108) North American Nickel ("NAN") is pleased to announce that diamond drilling of select priority targets has commenced on its 100% owned Maniitsoq project. The drilling follows on the heels of a field examination program, which included ground proofing geophysical conductive zones, identified from helicopter-borne time domain EM surveys completed by NAN in 2011 and 2012. The drill program now underway is planned to include a minimum of 10 holes totalling 2,000 meters of drilling.

A total of 75 conductive zones have been identified by two EM airborne geophysical surveys completed over the past two years on the property. From the 75 anomalies of interest and subsequent to 3D modeling and field examination, a select number of targets have been chosen for drilling which is now underway.

President Dr. Mark Fedikow states; ”Our technical team has done an excellent job of evaluation and compilation of historical work on the property, designing and commissioning our two airborne geophysical programs, helicopter-supported field work and integration of all datasets leading up to the drilling. We have identified numerous high potential drill targets for follow-up with our first drilling program..”

MANIITSOQ PROJECT BACKGROUND

The Maniitsoq area has seen relatively little exploration activity given the abundance of high grade nickel sulphide occurrences. Most of the nickel at Maniitsoq is associated with noritic intrusions that are concentrated in (but not restricted to) a belt that is over 70 km long and up to 15 km wide, referred to as the Greenland Norite Belt (GNB). Historical exploration records indicate drilling for nickel mineralization dates back to a period between 1965 and 1972 when 119 shallow drill holes were reported. The holes tested exposed sulphide mineralization and shallow electromagnetic (EM) anomalies directly associated with outcropping mineralization. All but a few were drilled to very shallow depths using small portable Winkie drills. The average hole length was just 53 meters.

Nevertheless, numerous significant intersections included:

- Imiak Hill: 9.85 meters @ 2.67% Ni, 0.60% Cu,

- Fossilik: 12.89 meters @ 2.24% Ni, 0.63% Cu, and

- Quagssuk: 4.95 meters @ 1.97% Ni, 0.43% Cu.

In 1995 Cominco Ltd, in conjunction with the Geological Survey of Denmark and Greenland (GEUS), flew a large portion of the GNB with a GeoTEM fixed wing, airborne EM system. Relatively few EM anomalies were detected. A review of this airborne survey data revealed that much of the survey was flown well above the minimum effective height needed to gather useful data and, therefore, detected few anomalies. Follow-up prospecting and limited surface geophysical surveys by Cominco in 1995 and 1996 and by Falconbridge Limited in 2000 did not lead to any drilling. Re-sampling of the drill core and surface showings by both Cominco and Falconbridge did, however, confirm the generally high nickel tenor of the sulphides (recalculated to approximately 8% nickel in 100% sulphide in the case of Falconbridge's work).

NAN acquired the project because it believes the area has the potential to host a major new nickel mining camp. By using modern, time-domain, helicopter-borne EM systems, exploration will be more effective at detecting nickel sulphide deposits in the rugged terrain at Maniitsoq than the fixed wing survey flown in 1995. Helicopter TDEM systems were not available in 1995 and their availability and improved sensitivity to buried and blind nickel deposits provides NAN with a significant advantage over previous explorers.

For previous press releases and more information on NAN and the Maniitsoq project please visit the company website at www.northamericannickel.com.

Qualified Person

All technical information in this release has been reviewed by Dr. Mark Fedikow, P.Geo, who is the Qualified Person for the Company and President and Chief Operating Officer, North American Nickel Inc.

________________________________________________________________________________________