I think you misread.  They were testing the southern extension of LM and the Une produced 600 bopd on test at that location. BUT    " The well has been completed with an electro-submersible pump and is now producing from the main middle Gacheta sand interval at a rate of approximately 1,850 bopd under natural flow and less than 0.5% water cut."