The boys at GALP and PEC would be dissapointed if that is all they got out of the ground ssthv. But keep in mind this flow rate was achieved through a 43 m damaged formation and perforated cemented casing. I believe this flow rate would be considered a stripper well, but someone reading with drilling experience would have to answer that

I think they would be much happier with the 1 - 2 MMcfd they flowed in the Alj 2 open hole test until water influx killed the 100 m interval at 2415 meters

 

jmo