To me, with my limted knowledge on the ground, I still wonder why I have not heard about another rig moving into the theater of operation to get not only the "8" well program wrapped up ( at least in the drilling aspect) but to begin the 2013 campaign that has been previously touted by NR's.  I'm tired of hearing about one rig moving from site to site when I've looked at Ensign Drilling's reports about the play wherein they state that they will be moving another rig or "rigs" into play based on New Zealand Energy's requests.  We're talking about proactive development and monetization based upon reservoir parameters and processing rates.  Another thing NZ needs to be spelling out as it pertains to long term strategy in the area.  Just talkin Taranaki here!