The 8-31 is a deviated well and is currently producing ~330bbls/d with almost no water from a single cardium sand (most wells in the area have multiple repeats of cardium). If MEI can put a horizontal into the same zone that would be an outstanding well. The gas/oil ratio is also pretty steady in the 8-31 indicating little depletion so far.