MY COMMENTS IN CAPS.
 
Clearly, the priority at Las Tres Palmas is to complete delimitation of the Romero prospect,
specifically along its northern side. Additional in-fill drilling is not recommended at this
stage of the programme nor is further deep drilling. The three holes drilled to test the deep
chargeability anomaly, the response to the andesite-hosted pyritic stockwork, do not contain
metal values of interest. In future, holes may be stopped once 100 m or so of the pyritic
stockwork have been intersected.

(IF FOLLOWED THIS COULD MEAN MORE HOLES IN LESS TIME)
 
Based on the evidence for locally exposed as well as concealed gold-zinc mineralization
farther south along the Las Tres Palmas trend, the isolated, deep chargeability feature north
of Escandalosa is an obvious target for immediate drill testing in search of high-grade gold-
copper mineralization in its upper parts. The similarity of this chargeability feature with that
defined at Romero is the main justification for this recommendation.

(IMMEDIATE HAS ALREADY APPARENTLY BEGUN)