I sent EXS an email yesterday asking about the 43101 and drill results. They told me that the firm they hired to do the 43101 is so backed up with work that they rushed through the report and it was completely wrong so they sent it back to get it re-worked. Hopefully a revised 43-101 will be by the end of the month. I expressed my dis-pleasure but was reassured everything is still on track. Drill results to be out shortly as well. A winter road is under construction as we speak to drill Kidd property. They have two targets which hopefully produce some big numbers.

So, in typical EXS fashion we sit and wait while they get their stuff together.