From what I have seen with other companies the timeframe for drilling to similar depths (1200 m) takes about 3 to 4 weeks. I would anticipate an NR this week or next stating they have drilled to the desired depth and indicate if it is a viable well. If it is viable, a subsequent NR would be issued in about 2 to 4 weeks indicating initial production numbers.