Excellon RE: EXN announces Drill Campaign at DeSantis Gold Mine  

 Project, Timmins Ontario, Canada, 

The Porcupine Gold Camp is located in Timmins, Ontario,

 one of the world's great gold producing camps.

 

In 2010, Porcupine marked its 100th year of continuous mine and mill operations and

has produced more than 70 million ounces of gold since production began.

 

Hollinger Mine (19M/oz) and Dome Mine (17M/oz to date) 


 • Close to Goldcorp Hollinger super pit expansion 

 
* Porcupine Mining Camp of Golden Horse Shoe below 

 * Hudson Bay, Ontario - 

 * were about Au 200 million ounces been produced 

 

 Excellon’s DeSantis Gold Mine Project

 

 is located along the Destor-Porcupine Tectonic Zone (“DPZ”), the main   structure controlling

 gold deposits in the Timmins gold camp, appr. 5 km southwest of downtown  

 Timmins, 11 km west of the Dome Mine currently owned and operated by Goldcorp Inc. and

 14 km east of Lake Shore Gold Corp.’s Timmins Mine.

 

The DeSantis Gold Mine property covers approximately 5 km of strike length within highly prospective volcanic  

 stratigraphy on the north side of the DPZ, including the past producing DeSantis Mine.

Gold deposits in the Timmins gold camp occur in a variety of forms, but virtually all can be related to  

 structural controls associated with major deformation zones, the foremost being

 the Destor-Porcupine Tectonic Zone, thus are mesothermal gold deposits, exhibiting the form of

 ‘shear-zone hosted gold deposits.’ Such gold deposits are typified by wide alteration envelopes

 hosted within volcanic sequences with a locus of deformation and alteration in discrete zones which

 also host significant veining including quartz and accessory minerals and gold.

 The DeSantis Property hosts at least five known gold-bearing zones, including the Contact Zone,  

 Hydrothermal Zone, Albitite Zone, Arsenopyrite Zone, and East Pit area, all of which are located near

 the area of historic underground mining on the property.

 The DeSantis Gold Mine produced 35,800 ounces of gold from 178,650 tonnes of ore which

 graded 6.2 g/t gold during its intermittent production history.

 Production was carried out from nine levels sourcing principally the Albitite and Hydrothermal Alteration  

 Zones, accessed via the 379 m-deep DeSantis No. 2 Shaft.


Neighbors on both side of our former; 
DeSantis Gold Mines
 
producer & large gold mine project PR that they have - 

Gold 30 Million ounces mine potential - 

30 million oz Gold Potential
 

http://www.youtube.com/watch?v=ohqLNvGeMJ0 

http://explorresources.com/_resources/projects/Timarea_Model_Splay_Fault_Corridor_Oct_15_2010.pdf 

Moneta Porcupine Mines Inc (TSE:ME) Gold 30M oz. + ? - 
Read more at http://www.stockhouse.com/bullboards/messagedetail.aspx?p=0&m=31735386&l=0&r=0&s=ME&t=LIST#iWZYqvfMgU3ulKmM.99 

http://www.porcupinegoldmines.ca/en/hollingeranimation.asp 

http://www.monetaporcupine.com/i/pdf/MONETA_OCTOBER_2012_POST_RESOURCE2.pdf 

http://www.metalscreek.com/upload/documents/timmins_deposits_everything_sm.pdf 

Excellon announces Drill Campaign at DeSantis Project, Timmins 

Download PDF 
October 31, 2012 
http://www.excellonresources.com/Investors/Press-Releases.aspx?CnwID=135041 

Toronto Stock Exchange - EXN 
TORONTO, Oct. 31, 2012 /CNW/ - 

Excellon Resources Inc. 
(TSX: EXN) ("Excellon" or "the Company") is pleased to announce 
that it has commenced a 5,000 metres ("m") diamond drilling 
program on its DeSantis Project in Timmins, Ontario. 
Highlights from previous drilling on the project include:
 

Hydrothermal Zone: 
7.90 g/t gold over 5.2 m in hole DS10-02; 
3.40 g/t gold over 9.9 m, including 13.70 g/t Au over 0.7 m in hole DS10-06; 
3.63 g/t gold over 23.17 m, including 14.25 g/t gold over 1.17 m in hole DS10-10A; 
Albitite Zone: 
1.74 g/t gold over 12.0 m, including 10.39 g/t Au over 1.5 m in hole DS12-004.
 

 

"We are very pleased with our technical progress at DeSantis since 
the completion of the last drilling campaign in April. 
The exploration team in Timmins has done a thorough job of 
compiling historical data and come up with several new target 
areas,"stated John Sullivan, Vice-President of Exploration. 

"This regional approach has enabled the Company to see the project 
in a new light and we look forward to the results of this 
drilling program." 

The DeSantis Project, which includes the past producing 
DeSantis Gold Mine, 


covers approximately five km of strike length within the highly 
prospective geology of the Destor-Porcupine Deformation Zone 
("DPDZ"), the main structure controlling gold deposits in the 
Timmins gold camp. 


The DeSantis Gold Mine

 

 produced 35,800 ounces of gold from

 178,650 tonnes of ore which

 graded 6.2 g/t Au during its intermittent 
 production history. 


The property is located approximately 11 km west of 
Goldcorp Inc.'s Dome Mine and 14 km east of 
Lake Shore Gold Corp.'s Timmins Mine. 


Exploration on the DeSantis Project since 2010 includes 
5,888 m in 15 holes in 2010 and 27 holes (seven abandoned due to 
technical issues) totalling 11,039 m in 2011/2012. 

In mid-October the Company completed a comprehensive program of 
geotechnical compilation, relogging and sampling of recent and 
historic drill core and reviewing the project in a regional 
context. 

Based on the results of this work the Company commenced the 
current 5,000 m diamond drilling program in late October. 

Drilling will follow up on promising recent results and will test 
undrilled areas east of and below the known Albitite Zone. 

In addition, geophysical and geological targets will be tested in 
a series of holes on areas of the project that have not been 
thoroughly explored. 

Map 1 shows the location of the property in the Timmins Camp, 
while Map 2 is a longitudinal section showing the location of 
recent and planned drilling near the No. 2 shaft on both the 
Hydrothermal Alteration and Albitite zones. 

Beschefer Drill Campaign 
A winter 2013 drill program is being planned for the Company's 
100%-owned Beschefer property, which is located approximately 
60 km northeast of the Casa Berardi Mine, 
80 km east-southeast of the Detour Gold Project and 
12 km east of the past-producing Selbaie Mine. 

The property hosts the "B-14 Zone", which was discovered by 
Billiton Canada Inc. in 1995, but marginally explored prior to 
the Company's involvement. 

In early 2012, the Company completed 8,867 m of drilling in 
33 holes focussed on the B-14 Zone. 
Significant intersections included 
13.07 g/t Au over 8.75 m including 
58.5 g/t Au over 1.50 m in hole BE12-014, and 
10.35 g/t Au over 1.50 m and 
3.56 g/t Au over 6.06 m in hole 
BE12-030. 


The B-14 Zone is found within a typical Archean volcanic 
assemblage, with gold hosted in pyritic quartz veining within a 
mylonitic unit. 

As the Beschefer property has little or no bedrock exposure and is 
muskeg-covered, drilling is most effectively performed during 
freezing conditions. 

Update on La Platosa Production 
Excellon is also pleased to announce that milling recommenced 
at the Company's mill in Miguel Auza, Zacatecas on October 29th. 

In the past few days, the Company trucked 1,800 tonnes of ore 
from its high-grade silver/lead/zinc 
La Platosa Mine in Durango, Mexico. 

An updated production forecast for the remainder of 2012 will be 
released in due course. 

Qualified Persons 
The Company's DeSantis Project and Beschefer Property exploration 
programs are supervised by John Sullivan, B.Sc., PGeo., 
Excellon's Vice-President of Exploration and Stephen Conquer, 
B.Sc., PGeo., Excellon's Exploration Manager, Canada. 

Mr. Sullivan is an economic geologist with over 35 years of 
experience in the mineral industry. 
Prior to joining Excellon in 2007 he was a senior geologist at a 
Toronto-based international geological and mining engineering 
consulting firm where he evaluated properties and prepared 
NI 43-101 reports on gold and base metal projects 
in Canada and internationally. 
In addition he has held senior positions with two large Canadian 
mining companies where he directed major exploration programs, 
managed field offices, and evaluated projects in Canada, Europe, 
Africa and Latin America. 

Mr. Sullivan is not independent of Excellon as he is an officer 
of the Company. 

Mr. Conquer is an economic geologist with over 30 years of 
experience in the mineral industry. 
Prior to joining Excellon he was Senior Project Geologist and 
Chief Mine Geologist for a company with gold exploration and 
mining operations in Timmins where he directed surface and 
underground exploration programs and the geological component of 
underground mining operations. 
Previously Mr. Conquer also held Chief Mine Geologist positions at 
operations near Sudbury and Marathon and senior exploration 
positions in the Abitibi and Red Lake Greenstone Belts. 

About Excellon 

Excellon's high-grade silver production drives transformative 
exploration potential. 

The Company's 100%-owned La Platosa Mine in Durango is Mexico's 
highest grade silver mine, with lead and zinc by-products making 
it one of the lowest cash cost silver mines in the country. 

With 41,000 hectares of exploration ground surrounding the mine, 
Excellon is focused on discovering the large-tonnage Source of 
the high-grade silver mantos currently in production. 

Such a discovery has the potential to transform 
La Platosa into the next major project in 
Mexico's prolific CRD/silver belt. 

On behalf of 
EXCELLON RESOURCES INC. 
Peter A. Crossgrove 
Executive Chairman 

Read more at http://www.excellonresources.com/Projects/DeSantis.aspx

 
 
replypostthreaded view

Read more at http://www.stockhouse.com/bullboards/messagedetail.aspx?s=EXN&t=LIST&m=31757411&l=0&pd=1&r=0#ei4OPrGZTGuUloUQ.99