Jiama /The high grade gold mineralization section in the hole ZK4504 has shown the potential to find a standalone gold deposit in the Jiama deposit area. It will focus on four targets in the 3km long three-in-one stacked system comprising Hornfels (top), Skarn, and Porphyry (base) mineralized bodies. The first target is in-fill drilling to complete 100x100m and 200x100m spacing in the central part of the Skarn mineralized body. The aim of this drilling is to upgrade the current inferred and indicated resources to the indicated and measured category. The second target is further drilling work surrounding the existing stand-alone quartz-diorite porphyry gold mineralized body and gold-rich Skarn type mineralized body It will focus on four targets in the 3km long three-in-one stacked system comprising Hornfels (top), Skarn, and Porphyry (base) mineralised bodies The aim of this drilling is to define a reasonable size gold or gold rich deposit. The fourth target is to explore the porphyry mineralised body in the center of the mineralised zone by drilling to 2000m depth. A magneto-telluric geophysical survey may be conducted to define the extent of the deep porphyry system and guide selection of the deep drill holes.

China Gold International's CEO, Dr Xin Song says, “The key objectives of this aggressive drilling plan are to further define the mineralized zone on the property that we believe may host a meaningful gold deposit, further expand and upgrade the existing resource base and investigate the deep porphyry copper-molybdenum mineralized body at the Jiama project both down depth and along strike....CGG on  Jiama Drill results there is a need  to match CSH 10 MILLION OZ of GOLD!  on CGG

feasibility study and reserve analysis.  .....there drilling deep for a reason at Jiama...G.o.l.d and lots of it!