From 43-101
The following annual mine production plan is estimated at a possible ramped-up milling rate
of 60,000 tonnes per day, starting in the third year of production
Mine life and mine production daily rate based on this increased milling rate are similar.
Total gold production over life-of-mine of 7.72 million ounces gold would be identical in this
scenario, at a higher average of 679 Koz per year. The first five years of production in this
case would account for 3.50 million ounces of production at an average rate of 700 Koz per
year.
Current production
The mine produced 33,102 ounces of gold during the month with an average grade milled of 0.815 grams per tonne and an average recovery of 89.3%. In November the mine had an average daily throughput of 48,772 tonnes per operational day, up from the third-quarter average of 43,181 tonnes per operating day.
Canadian Malartic has produced 356,476 ounces of gold year-to-date.
Mike they are right it's just like looking in a mirror, a circus mirror that makes you 10x bigger than you actually are. At least Marg is gone, or renamed or something. Remember to listen to posters who just got here and say things like Barry has grades better than Osisko and SGS says Barry has the size potential to match it,
OSK 43-101 says 245.8 Mt at 1.13g/t for 8.97 M ounces of contained gold,
MTO is Indicated 7,701,000T 1.29g/t for 309,500 ounces of contained gold
What they said is close OSK only has 20x more gold than MTO
Jumpin Jimminy - I believe these guys for sure, especially when they don't post a single reference to a credible source for the garbage that comes out of their pens.
Read more at http://www.stockhouse.com/bullboards/messagedetail.aspx?p=0&m=32046763&l=0&r=0&s=mto&t=list#XSSYGJXIlOHl5yGu.99